Page 74 - 56-1 One Report 2022 EN
P. 74

Part 1 Business Operation and Operating Performance

               Objectives

                                                                     1 .   To  build  capable  technicians  with  the
                                                                     expertise to receive work orders to install and
                                                                     maintain  satellite  internet  systems  in  their
                                                                     hometowns and remote areas.

                                                                     2. To promote professional skills for the future
                                                                     careers  in  line  with  the  technical  college
                                                                     curriculum  and  provide  a  certificate  of
                                                                     completion for future career advancement.
                                                                     3. To create jobs and income for students while
                                                                     studying.


                                                                     4 .  To set up a customer service center in the
                                                                     area by means of a  student club, which can

               receive the Company’s orders for satellite installation, repairs, and satellite internet services.

               Target students

                      40 Students and teachers of Mae Sod Technical College, Tak province


               Trainings

                      2-day training covering both lecture and coursework on satellite installation and maintenance at Mae Sod
               Technical College.

               Goals

                      Short-term: Within 3 years, 1 school per year totaling 3 schools within 3 years
                      Long-term: Within 5 years, 1 school per year totaling 5 schools and revisit 2 old schools per year.

               Project results
               The Company has provided 1 training course to 40 students
               and 6  teachers in a  technical college in Mae Sod, Tak
               province. A student club was set up to enhance skills and
               earn income for students, and it has received work orders
               from Thaicom to install Express Net/wifi internet system at 2
               remote customer sites. With this method, the Company did
               not have to dispatch its own staff to do the work, which has
               saved both the travelling cost and man-hours, up to 41%.
               (Installation service fee paid to the student club is 7,000
               Baht per site, whereas travelling cost, fuel cost, per diems
               for 2 dispatched workers from the Company, and payment
               fee for hiring a 4-wheel drive vehicle is around 12,000 Baht
               altogether.)



                                                                                                 Part 1 Page 60
   69   70   71   72   73   74   75   76   77   78   79