Page 76 - 56-1 One Report 2022 EN
P. 76
Part 1 Business Operation and Operating Performance
Comparison of electricity consumption
Office 2019 2020 2021 2022
1.Thaicom office on 28-
29 floors, SJ Infinite 1 118,124 kWh 103,274 kWh 66,203 kWh 175,746 kWh
Business Complex (425,247 MJ) (371,786 MJ) (238,330 MJ) (632,686 MJ)
2. Thaicom Teleport and 4,320,300 KWh
DTH Center, Pathum 4,590,840 kWh 4,371,660 kWh 4,344,096 kWh (15,553,080 MJ)
Thani (16,527,040 MJ) (15,738,000 MJ) (15,638,746 MJ)
Operating Results:
The electricity consumption at Thaicom Teleport and DTH Center, Pathum Thani, decreased by 23,796
kWh or 0.55% compared to 2021.
In 2022, the Company expanded the office on the 29th floor at SJ Infinite 1 Business Complex to support
employees from Nonthaburi, leading to more electricity usage in that year.
Amount of electricity produced from solar panels:
Office 2019 2020 2010 2022
1. Thaicom Teleport and
DTH Center, Pathum Thani 92,152 kWh 104,545 kWh 99,234 kWh 105,345kWh
Performance of energy conservation Measures in 2022 compared to goals.
Goals Operating Results
Budget (Total reduction) (Total reduction) Saving
Project Measure
(Baht) Kilowatt- Kilowatt- Baht/yea (%)
hour/ year Baht/year hour/ year r
1) Thaicom Teleport and DTH Center, Pathum Thani
1. Cleaning CDU
and Filter Air
conditioner 88,000 33,208 115,230 2,233 9,112 0.13
(Preventive
Maintenance)
Total 88,000 33,208 115,230 2,233 9,112 0.13
2. Water Management
Although the Company does not directly use water resources in its main business operations, it is aware that the
water resources are important and necessary for every life and that it is our responsibility to the society and
environment. The Company has managed water for activities within the office wisely and campaigned for employees
to use water wisely through public relations media within the organization to instil awareness of resource utilization
for maximum benefit. The Company has focused on wastewater treatment from the office buildings before disposing
to public sewer systems. Since 2017, after launching the Thaicom Loves Earth Campaign, the Company has
continued analyzing the quality of wastewater to ensure the quality of the wastewater treatment system. There is
also a regular inspection of water pipe leakage at each point by checking the amount of water used each month.
In 2022, the Company used the service from the Water Quality Management Department, The Public Health Ministry
for inspecting its effluent quality.
Part 1 Page 62

